The Ad’s One Price Is a Cap, Not a Bill: What Is Actually Charged, Stage by Stage

Start an ad and open its progress page: each stage shows its own price as it runs; the sum stays under the one price on the start button.
What the one price is
Each ad stage has a price: reading the photo is free, cleaning it is one sheet, writing the script is a writing charge, the breakdown is a parse, sheets are per image up to a bound, shots are per second by the tier, the final cut is per second. The one price is those at their maximum, added up. Stage list and prices: Ad Options.

What is actually charged
Each stage freezes its own price when it starts and settles when it delivers, exactly as the same action would in a drama project. The bound on sheets is an upper limit; an ad with two people and one scene uses fewer. The shots are priced by the real seconds and tier. So the credit history shows several rows for one ad, and their sum is what the ad cost. Reading Your Credit History.
Review each step
The same stages, charged the same way, with three stops: after the script, after the cast and sets, after the shots. Nothing is charged while a stop waits. Each Continue shows the price of the rest at that moment; change nothing and the total is what one-click would have cost. Adding shots raises the rest, and work you ask for at a stop — an AI rewrite, a redrawn sheet — is priced on its own button. Ads started in the old expert mode, before 5 November 2026, paid the clean-up and script up front and priced every later step on its own button. One-Click or Review Each Step.
Failures, retries, price changes
SceneMixer refunds a failed stage on the normal rules (provider not reached, content blocked: refunded; delivered: charged). The retry button shows a new quote for the stages still to run. Before each paid stage the ad checks the price against the quote; if it rose (a tier repriced, your discount ended), the ad pauses with a new number to confirm. Price Changed.
Balance
Starting the ad checks that your balance covers the one price; each paid stage re-checks the remaining stages before it starts and pauses if the balance has dropped below them. A paused ad resumes from the same stage after a top-up. Refund Rules.
| Stage | Priced as | In the one price |
|---|---|---|
| Read the photo | Free | 0 |
| Clean the photo | One sheet (0 for screenshots, places and vehicles, unless people have to be removed) | One sheet |
| Write the script | Writing charge | Writing charge |
| Break it down | Parse | Parse |
| Sheets | Per image, actual count | Upper bound |
| Shots | Per second, real length and tier | Full length |
| Final cut | Per second | Full length |
FAQ
Why did the ad cost less than the one price?
Fewer sheets than the bound, or shorter shots. SceneMixer treats the one price as a cap.
Can it cost more than the one price?
No. If a stage's price would exceed the quote, the ad pauses and asks first.
Why several rows in my history for one ad?
Each stage is its own charge; the sum is the ad.
Is the first ad free?
No. SceneMixer never applies the free first project to ads.
Does regenerating a shot later count against the one price?
No. After the ad is done, regenerations are priced per action like any project.
The number on the button is the ceiling
Stages charge what they use; the total does not go above it.
Updated November 15, 2026